General
no comments
MDC
Report e-link for MDC (Vladimir)
MMB
Olena contribution about the status of the development of the AMC-DAQ card
Vladimir: phase shift between GTH and GTY to be verify
- 32 GTH (8 Banks) detector connections (3 banks x2)
- 16 GTY ( 4 Banks) for DAQ + spare
FPGA firmware
CRC checker developed (simulation) (Kai - presentation)
Beam Test
- beam test setup is fully working
- Development of second test system with 2 ToASt
- Mechanical integration of the detetctor to the beam test setup