MDC

Report e-link for MDC (Vladimir) 

 

MMB

Olena contribution about the status of the development of the AMC-DAQ card  

Vladimir: phase shift between GTH and GTY to be verify 

- 32 GTH (8 Banks) detector connections (3 banks x2)

- 16 GTY ( 4 Banks) for DAQ + spare   

 

FPGA firmware

CRC checker developed (simulation) (Kai - presentation) 

 

Beam Test

- beam test setup is fully working

- Development of second test system with 2 ToASt 

- Mechanical integration of the detetctor to the beam test setup 

 