PANDA MDC

Europe/Berlin

General 

- New proposal BMBF, deadtime: end of June

- toward the production of microstrip

- high-granularity low-power low-material budget monolithic pixel detectors for PANDA MVD

MDC development

e-link 

MMB development 

 

FPGA firmware 

Kai - contribution about CRC-check on MDC 

 

LpGBT 

- Setup the framework for the email (LpGBT) accessible via Git lab

Beam Test 

- waiting for feedback

-ordered the PCB (breakout board, based on Turin layout)

- arrived the small FMC-FMC adapter PCB (AC-coupled signals)

There are minutes attached to this event. Show them.
    • 4:00 PM 4:20 PM
      CRC checking on MDC 20m
      Speaker: Kai Lukas Unger